Kerkenes Home
<<
Previous Page
Next Page
>>
Back to Contents Page
Up
Türkçe Çeviri
THE 2007 SEASON

 

Figure 17
 
THE 2007 SEASON
 
The 2007 season began on May 11 and the Depot was closed on July 13. At the end of the season we were pleased to show the progress of the ongoing conservation work to the Governor of Yozgat, Amir Çiçek, the Sorgun District Governor, Meftun Dalli, the Mayor of Sorgun, Ahmet Simsek, and other visitors from local authorities and organisations (Fig. 17).
The Geophysical survey in the area of the Palatial Complex was conducted in May. Transportation studies consisted of checking plans of the street network and urban compounds in the lower area of the city and, in June, excavation of seven trenches to test transportation simulations and to sample occupation material from different parts of the city. Work on site also included cleaning and conservation at the Monumental Entrance to the Palatial Complex and the Cappadocia Gate. A new collaboration involves a study of geomagnetic dating across Turkey.
During much of the season work continued on the conservation and restoration of architectural pieces from previous years together with the preparation of a series of final reports. Construction of the new workroom with a large covered terrace for the mending, restoration and housing of large architectural pieces was completed before the winter.
 
Symposium
During the week of May 28 to June 1, Geoffrey Summers attended the Annual Symposium in Kocaeli where he presented the significant results of the 2006 season.
 
Kerkenes Home
<<
Previous Page
Next Page
>>
Back to Contents Page
Up
Türkçe Çeviri